• Bottled Water Filling Production Line
  • Bottled Water Filling Production Line
  • Bottled Water Filling Production Line
  • Bottled Water Filling Production Line

Bottled Water Filling Production Line

Product Description

Bottled Water Filling Production Line Description:

Bottled water filling production line integrates washing, filling and capping. Bottled water filling machine is widely used in the filling of various airless liquid materials, such as mineral water, purified water, drinking water, mountain spring water, etc., with an output of 2000-30000 bottles per hour. The bottled water production line includes bottle blowing machine, water treatment equipment, blow dryer, sleeve labeling machine, inkjet printer, carton packing machine or PE film package.

Bottled Water Filling Production Line

Bottled water filling machine has advanced structure, work balance, safe operation, convenient maintenance, stepless speed regulation and high production efficiency. Bottled water filling equipment is an ideal equipment for small and medium-sized water plants. The bottled water filling equipment adopts touch screen operation, which can realize man-machine dialogue and real-time display of equipment operating status. The bottled water filling machine adopts an efficient cap sorting and automatic cap supply system, and has an excellent cap feeding and cap missing protection device.

Bottled Water Filling Production Line

 

Bottled Water Production Line Service:

MODERN MACHINERY offers engineer to assist you in installing your bottled water production line. Upon installation of your equipment or line, the engineer stays on-site to watch your new equipment run smoothly and train your operators. Even after our specialist leaves your plant, we are ready to give you timely, courteous service when you need it.

Bottled Water Filling Production Line

Our engineer offers the following services:

1. Installation of equipment or packaging line at the customer’s plant
2. Coordinate schedule with mechanics to perform changeovers and preventive maintenance activities
3. Perform mechanical adjustments (if needed) on equipment and packaging line to optimize equipment’s performance
4. Resolve equipment issues
5. Provide on-site training on all assigned procedures

An MODERN MACHINERY engineer will be in-charge of the equipment setup and adjustment in your plant. All of the activities will be focused on optimizing the equipment to maximize production output.

 

Shipping & Transportation

Bottled Water Filling Production Line

Spread the love
Technical parameter
Model
 Heads  of
washing  filling
sealing
 Production
capacity
(bottle/hour)
 Suitable
bottle
diameter
(mm)
 Spraying
pressure
(kg/cm2)
 Main
motor  power
(kw)
 Overall  dimension
(LxWxH)
(mm)
 Weight
(kg)
 XGF16126
 16-12-6
 2000-4000
 Φ=50-  110=170
330-  2250ml
 2-3
 2.2kw
 2400x1650x2500
 2500
 XGF18186
 18-18-6
 5000-7000
 2.2kw
 2600x1920x2550
 3500
 XGF24248
 24-24-8
 8000-12000
 3kw
 3100x2300x2800
 4500
 XGF323210
 32-32- 10
 12000- 15000
 5.5kw
 3800x2800x2900
 6500
 XGF404012
 40-40- 12
 16000- 20000
 7.5kw
 4600x2800x2900
 8500
 XGF505012
 50-50- 12
 20000- 24000
 11kw
 5450x3300x2900
 9800
 XGF606015
 60-60-15
 25000- 30000
 15kw
 6500x4500x2900
 12800
Video

Inquire

Leave a Reply

Your email address will not be published. Required fields are marked *

Please enter your message


    en_USEnglish