Zhangjiagang Modern Machinery Co.,Ltd.
More than 20 years technology & experience on bottle filling machine!
+86-137 3726 7104
Small scale water bottling machine is based on bottle blowing, filling and capping. Water bottling machine uses a servo system for synchronous control through the comprehensive application of multiple disciplines such as light, mechanics, electricity, and gas. The water bottling equipment realizes integrated control and production, improves production efficiency, reduces investment costs, reduces energy consumption and equipment maintenance costs.
Blowing part: the preforms enter the elevator from the billet supply hopper and are transported to the preform arrangement device, and the preforms are automatically arranged into the star wheel and sent to the heating zone through the preform arrangement. The processing of billets is fully automatically controlled, and the efficiency of billets is high without hurting the preforms.
Filling part: The blown bottle is transferred to the water bottling equipment through the transition wheel. The bottle entering the water bottling line is held by the bottle clamp on the lifting cylinder, and it rises and falls under the action of the cam. The water bottling equipment adopts the gravity filling method, the bottle mouth rises to open the filling valve to start filling, and the filling ends when the material rises to the position where the air return hole is blocked. After the filling is finished, the mouth of the bottle drops and leaves the filling valve.
Capping part: The bottle enters the capping machine through the transition wheel. The anti-rotation knife on the capping machine jams the bottleneck to keep the bottle upright and prevent it from rotating. The capping head keeps revolving and rotating on the capping machine, and realizes the actions of capping, capping, capping, and capping under the action of the cam to complete the entire capping process. The finished bottles are transferred from the capping machine to the bottle-out conveyor chain through the bottle-out dial, and then the three-in-one water bottling machine is sent out by the conveyor chain.
MODERN MACHINERY offers engineer to assist you in installing your water bottling line. Upon installation of your equipment or line, the engineer stays on-site to watch your new equipment run smoothly and train your operators. Even after our specialist leaves your plant, we are ready to give you timely, courteous service when you need it.
Our engineer offers the following services:
1. Installation of equipment or packaging line at the customer’s plant
2. Coordinate schedule with mechanics to perform changeovers and preventive maintenance activities
3. Perform mechanical adjustments (if needed) on equipment and packaging line to optimize equipment’s performance
4. Resolve equipment issues
5. Provide on-site training on all assigned procedures
An MODERN MACHINERY engineer will be in-charge of the equipment setup and adjustment in your plant. All of the activities will be focused on optimizing the equipment to maximize production output.
Model
|
Heads of
washing filling sealing |
Production
capacity (bottle/hour) |
Suitable
bottle diameter (mm) |
Spraying
pressure (kg/cm2) |
Main
motor power (kw) |
Overall dimension
(LxWxH) (mm) |
Weight
(kg) |
XGF16126
|
16-12-6
|
2000-4000
|
Φ=50- 110=170
330- 2250ml |
2-3
|
2.2kw
|
2400x1650x2500
|
2500
|
XGF18186
|
18-18-6
|
5000-7000
|
2.2kw
|
2600x1920x2550
|
3500
|
||
XGF24248
|
24-24-8
|
8000-12000
|
3kw
|
3100x2300x2800
|
4500
|
||
XGF323210
|
32-32- 10
|
12000- 15000
|
5.5kw
|
3800x2800x2900
|
6500
|
||
XGF404012
|
40-40- 12
|
16000- 20000
|
7.5kw
|
4600x2800x2900
|
8500
|
||
XGF505012
|
50-50- 12
|
20000- 24000
|
11kw
|
5450x3300x2900
|
9800
|
||
XGF606015
|
60-60-15
|
25000- 30000
|
15kw
|
6500x4500x2900
|
12800
|
Leave a Reply