- Overview
- FAQ
- Inquiry
- Recommended Products
It’s widely used for different material of bottles with capacity from 6000-24000BPH. Our hot melt glue labeling machine uses the roll label materials such as OPP, BOPP and composite paper to replace the PVC shrink label film. It can save 30% cost in power consumption and label material.








| Q1: What types of carbonated beverages can this filling line handle — cola, sparkling water, energy drinks, flavored soda? |
| A: It can fill cola, sparkling water, energy drinks and flavored soda perfectly. |
| Q2: What is isobaric filling, and why is it necessary for carbonated drinks? |
| A: Isobaric filling means filling under equal pressure. It prevents gas loss and foaming, keeps carbonated drinks fizzy and stable. |
| Q3: What bottle materials and sizes does the CSD filling line support — PET, glass, aluminum cans? |
| A: Supports PET bottles, glass bottles and aluminum cans, covers all common mainstream sizes. |
| Q4: How does the line maintain CO₂ levels during filling to avoid carbonation loss? |
| A: It adopts sealed isobaric filling and low-temperature working, effectively lock CO2 and reduce gas loss. |
| Q5: What is the production capacity range, and can the speed be adjusted? |
| A: Capacity: 2000-24000 BPH, speed is fully adjustable freely. |
| Q6: Is the carbonation level adjustable for different beverage recipes? |
| A: Yes, carbonation level is freely adjustable to fit various drink formulas. |
| Q7: What is the difference between your CSD filling line and the beverage canning line — when should I choose which? |
| A: CSD line: for PET/glass bottles, flexible for varied drinks; Canning line: only for aluminum cans, high speed. Choose bottle line for multi-drink business, canning line for mass canned drinks. |
| Q8: Can the same filling line switch between carbonated and non-carbonated beverages? |
| A: Yes. Just switch modes and adjust parts freely to produce both drinks. |
| Q9: How do you ensure hygiene and prevent contamination during the filling process? |
| A: Adopt full stainless steel structure, automatic CIP cleaning and strict sterile filling environment to avoid contamination. |
| Q10: What factory space and utilities (electricity, water, compressed air) are required for this line? |
| A: Need 120-350㎡ space, 380V industrial power, sufficient water and stable compressed air. |